No. Jefferson Jr/Sr High in Edgewater is not scheduled to close. Jeffco floated closing it in 2025 and sending students to Everitt Middle and Wheat Ridge High, then delayed the plan and has since committed to keeping Jefferson open as a comprehensive junior and senior high.
Few school questions come up as often around Wheat Ridge as this one. In early 2025, Jeffco Public Schools put Jefferson Jr/Sr High on its list of schools to close or repurpose, and the draft plan named Everitt Middle School and Wheat Ridge High School as the schools its students would attend instead. The headlines stuck, and many buyers and owners still assume a closure is coming.
The story has moved on since then. The district delayed the decision in the spring of 2025, an Edgewater community group put forward its own plan for the school, and later coverage reported a commitment to keep Jefferson open for at least two more years. At the same time, the November 2026 school tax measures are failing in early results, and the district has said more budget reductions will follow.
Jason Sirois is a Realtor with FORM at Compass Denver and a Wheat Ridge resident. Below is what Jeffco proposed, what changed, how the Jefferson and Wheat Ridge feeder areas work, what the 2026 election could mean, and how to confirm the schools for a specific address. We do not rate or rank schools; for that, visit, call and read the district’s own information.
What did Jeffco propose for Jefferson Jr/Sr High?
In February 2025, Jeffco released a draft plan to address declining enrollment. Chalkbeat reported that Jefferson, at 2305 Pierce Street in Edgewater, would close as a neighborhood school and reopen as a career-focused option school, with no change before the 2026-27 school year. Its secondary students would move into the Wheat Ridge feeder area: Everitt Middle School for middle grades and Wheat Ridge High School for high school. Jefferson had 629 students at the time, according to that report.
Jefferson serves grades 7 through 12. That structure dates to 2015, when Wheat Ridge 5-8 closed and Jefferson added seventh and eighth grade, as the Edgewater Collective has noted. So a closure would have affected both middle and high school students.
Why didn’t it close?
In May 2025, the district delayed the decision by one to two years and dropped the career campus idea. The Neighborhood Gazette reported that Jefferson would keep operating as it was while the district watched enrollment, and that a final recommendation was not expected that year. The same article gave enrollment and building capacity for the three schools involved:
| School | Grades | Students | Building capacity |
|---|---|---|---|
| Jefferson Jr/Sr High | 7-12 | 601 | 1,111 |
| Everitt Middle School | 6-8 | 456 | 895 |
| Wheat Ridge High School | 9-12 | 932 | 1,703 |
Source: Neighborhood Gazette, May 8, 2025. More recent state figures: Everitt had 437 students and Wheat Ridge High 886 in 2025-26, per the Colorado Department of Education’s SchoolView.
Those numbers explain why the idea came up: all three buildings were running well under capacity, and Wheat Ridge High had room to absorb Jefferson’s high school students. They also show why the decision drew so much attention in Edgewater, where the school sits.
The Edgewater Collective, a local nonprofit, proposed keeping Jefferson open with a deeper bilingual and bicultural focus. An 18-member community steering team worked on the plan through the summer of 2025. Colorado Community Media’s year-end roundup in December 2025 reported that the district had committed to keeping the school open for at least two more years. In March 2026, the Neighborhood Gazette reported that the district and board had committed to keeping Jefferson open as a comprehensive junior and senior high school, with about 600 students and a new principal set to take over.
We did not find a formal enrollment target or end date attached to that commitment, and we did not find any 2026 recommendation or board vote that names Jefferson, Everitt or Wheat Ridge High.
Which schools feed Jefferson, Everitt and Wheat Ridge High?
Jeffco organizes schools into articulation areas, or feeder patterns. According to the district:
- Jefferson area: Edgewater Elementary and Lumberg Elementary feed Jefferson Jr/Sr High, with no separate middle school.
- Wheat Ridge area: Maple Grove, Peak Expeditionary at Pennington, Prospect Valley, Stevens and Stober elementaries feed Everitt Middle School at 3900 Kipling Street, which feeds Wheat Ridge High School at 9505 West 32nd Avenue.
Addresses already in the Wheat Ridge area would not see their schools change under the 2025 proposal. The Jefferson area is centered on Edgewater. Whether a particular address on the eastern edge of Wheat Ridge falls in it is an address-level question, which is why the School Finder check below matters.
Could the November 2026 election change this?
Possibly, but nothing specific has been proposed. Jeffco put two mill levy overrides on the November 2026 ballot: 5A, about $73 million a year mostly for pay, and 5B, about $60 million a year mostly for building maintenance. With all eligible ballots counted, Jefferson County reported on November 13 that 5A was passing by 327 votes, inside Colorado’s mandatory recount range. The recount begins November 24 and must finish by December 4. 5B was failing.
Before the election, district leaders said that if the measures failed, more school closures, layoffs or salary freezes were possible, without naming schools. After the election, Denver7 reported the interim superintendent’s estimate of at least $13 million in budget reductions for 2027-28. Again, no schools were named. Any new closure proposal would go through a public process before a board vote, as the 2022 elementary consolidations did. Our post on what is happening to the closed Kullerstrand and Wilmore-Davis sites covers how that played out in Wheat Ridge.
How do I confirm the schools for a specific address?
- Enter the full street address in Jeffco’s School Finder on the district website.
- Check the articulation area map for the exact block, not just the neighborhood name.
- Call the school office if a home sits near a boundary.
- Note the enrollment calendar. Jeffco’s Round 1 enrollment for 2027-28 runs December 1, 2026 to January 15, 2027, with results posted January 26, 2027, per the district.
For sellers, it helps to list the currently assigned schools, and to correct older third-party pages that still show closed schools. Our post on how Kullerstrand’s closure changed Prospect Valley’s boundary shows how out-of-date school listings can linger. For more on the city, see our Wheat Ridge community page.
Frequently Asked Questions
Is Jefferson Jr/Sr High closing in 2027?
Not under any current plan we found. The 2025 closure proposal was delayed, and reporting through March 2026 says the district committed to keeping Jefferson open as a comprehensive junior and senior high.
Where would Jefferson students go if it closed?
The 2025 draft plan named Everitt Middle School and Wheat Ridge High School, both in the Wheat Ridge articulation area.
Where is Jefferson Jr/Sr High?
At 2305 Pierce Street in Edgewater. It serves grades 7 through 12 and is fed by Edgewater and Lumberg elementaries.
Does Wheat Ridge High have room for more students?
The Neighborhood Gazette reported 932 students in a building with capacity for 1,703 in May 2025. State data shows 886 students in 2025-26.
Will the Jeffco tax measure results close more schools?
Before the election, the district said budget reductions would follow if 5A and 5B failed, and closures were mentioned as one option, but no school has been named. 5B was failing, and 5A was passing by 327 votes ahead of a recount that must finish by December 4.
Which high school serves my Wheat Ridge address?
Addresses in the Wheat Ridge articulation area go to Everitt Middle and Wheat Ridge High. Check the exact address in Jeffco’s School Finder to confirm.
Questions about schools and a home you are buying or selling in Wheat Ridge? Jason Sirois and the FORM team at Compass Denver are happy to help you find the right sources.
This post is general information, not legal or educational advice. School assignments, boundaries and district plans can change; confirm current details directly with Jeffco Public Schools. Election figures were unofficial as of November 10, 2026.

